CF 02/08/2019
CrossFit Steamboat – CrossFit
Warm-up
Warm-up (No Measure)
10 pushups with shoulder tap
10 PVC pass thru
20 sec supinated deadhang
2x
then
6 1 arm high-pull ea
30 sec wall facing handstand hold
2x
Strength
Push Press
Push Press: Build to a 3RM. Rest 2:00
– 5-6 sets to build to a 3RM.
*Between sets perform Banded Facepull-apart x 15. The goal is to accumulate roughly 75-100 reps of banded facepull-aparts between all sets.
The goal today is to match our previous 2RM for 3. If you do not have a 2RM set a plan to with manageable jumps in weight so you end on a high note.
Metcon
Metcon (AMRAP – Rounds and Reps)
AMRAP 15:
5 kipping hspu
2 Rope Climbs (1 Legless + 1 w. legs)
1200m bike (.75 mile)/400m row
Rx+:(2 Legless Rope Climbs) (200 Meter Ski Erg)
L3: (2 wall climbs)(Rope Climb with legs)
L2: (Half of Wall Climb) (Band Assisted Strict Chin-up x 5)
L1: (30 Shoulder Taps) (10 Ring Rows w. 1 ct pause)
Today’s Metcon is about managing the bike while sustaining a challenging 80% pace for all sets. The Wall Climb/Rope Climb work should be quick so we want to be able to get off our bikes as fast as possible to maximize our time to complete wall climb/rope climb work.
Accessory Work
Warm-up (No Measure)
KB Trap 3 Shrugs: 3 x 10 each. Rest 60s.
– Front + Side + Behind Back